Project
Bicycle footbridges over the Poprad river
Description:
Description:
Production and assembly of the steel structure of two bicycle bridges connecting the Polish-Slovak borderland as part of the “EuroVelo 11-Prešov-Muszyna-Mniszek on the Poprad” project.
Technical data:
- arch footbridge with a downward ride in Milik with a theoretical span of 58.3 m, total length of 69.3 m
- arch footbridge with a downward ride in Andrzejówka with a theoretical span of 80.3 m, total length of 90.1 m
- Material: S355J2, S355JRH steel
- Weight of both structures: 62.2 Mg + 91.3 Mg
Date:
Date:
20200106
20200908
EXECUTED PROJECTS